2 min read
How to pull a roofing permit in Albuquerque
Albuquerque requires a permit for every reroof. Here's who can pull one, how to apply through ABQ-PLAN, when to call for the inspection, and the mistakes that cost you a double fee.
In the City of Albuquerque, every reroof needs a permit. The city's Building Safety Division lists re-roofing under building permits: "general permits are required for re-roof" (City of Albuquerque permits). This guide covers homes inside city limits. Unincorporated Bernalillo County and nearby cities like Rio Rancho run their own permits.
Who can pull the permit
A licensed contractor, when hired to do the job. If you're the roofer, the permit is yours to pull.
A homeowner, only for a single-family home they own and live in. Rentals need a licensed contractor (city re-roof handout).
If the home is in an HOA, get the association's approval before applying to the city.
How to apply
Online through ABQ-PLAN, the city's permit portal, where you can apply, upload documents, pay and track the permit without visiting the office (ABQ-PLAN).
In person with a permit technician at Building Safety.
Have the job address, your contractor license number and type, the roof type (asphalt shingle, tile, metal, built-up or membrane), and whether it's a re-cover or a full replacement.
Fees
The residential re-roof fee is set in the city's Uniform Administrative Code, and the city's Building Safety resource page has a fee estimator. The city's own printed handout lists a $35 fee, but that handout dates from 2013, so check the current amount in ABQ-PLAN or with Building Safety before you quote it to a customer.
Inspections
Call for the inspection when the new roof is at least 50% complete (city re-roof handout). The inspector will need access to the roof, and may take a core sample to see how many layers are on it. Building Inspections can be reached at 505-924-3320.
Rules that come up on a reroof
The city's reroofing code handout (Information on reroofing codes) points to the International Residential Code:
Two or more layers already? All layers must come off down to the deck before the new roof goes on.
Re-covering? The roof structure has to carry the new material and the equipment during installation.
Low slopes. An existing roof that drains within 48 hours of rain counts as having positive drainage and doesn't have to meet the minimum slope rules for new roofs.
Mistakes that cost money
Starting before the permit is issued. The city can issue a stop-work notice and charge a double fee.
A homeowner permit on a rental. Rentals need a licensed contractor's permit.
Missing the 50% inspection. Calling after the roof is finished means the inspector can't see what's underneath.
Assuming the city covers the whole metro. Check whether the address is in city limits before you apply.
Codes and fees change. Treat this as a guide, and confirm anything you'll quote or rely on with Albuquerque Building Safety (505-924-3320). In Roofpeace, a job's permit lives on the job: when you applied, when it was issued, and each inspection until the final passes.